wiredinUSA July 2020
Confirming plant power
Gerdau Long Steel North America has confirmed a 20-year power purchase agreement with solar energy provider 174 Power Global. The agreement is coupled with a planned 80MW solar power facility to be built alongside Gerdau Midlothian in Midlothian, Texas.
“Gerdau has a culture of sustainability,” says Gerdau Long Steel North America president ChiaYuanWang. “Theproducts from our Midlothian facility are already made from 100% recycled scrap metal. Developing and utilizing green energy is an innovative way to further enhance our environmental contributions.” Construction is scheduled to begin before the end of 2020, with a projected completion date near the end of 2021.
The project will comprise 231,000 solar panels across 700 acres.
THE MAC EDGE
®
Breaking new ground in nondestructive testing since 1928.
See the Rotomac® 20mm EC Rotary at Tube 2020 Hall 6, Stand H-20 http://www.mac-ndt.com/tube-2020
mac-ndt.com
WiredinUSA 1/2 pg HORZ MARCH 2020 Ad.indd 1
2/13/20 11:12 PM
wiredInUSA - July 2020
26
Made with FlippingBook Publishing Software