TPT November 2023
Welding systems for structural tubes
Plants & Equipment
Pipe & Tube Processing Technology
Bending & Forming Technology
Tube Manu facturing & Distribution
Tube Accessories
Profiles
Plastic Tubes & Pipes
join the best: 15–19 April 2024 The decision makers are at Tube 2024. Meet the world’s market leaders and pioneers from the world of pipes and tube processing. Expe rience innovations, leading future trends as well as new ways of promoting sustainability: tube.de/ecometals_en
The robot allows for fully automated production of welded tubes
VOORTMAN Steel Machinery has launched the Voortman Fabricator, a welding system for structural steel and tubes. The new system is capable of producing the most common steel construction profiles – plates, angle irons, tubes, U-profiles, crane runway consoles – and is the world’s first welding robot that can both fit and weld. As a necessary solution to the shortage of welders, this robot allows for fully automated production of welding. Welders who perform this craftmanship can now focus on specialised welding projects instead. The welding process will no longer be interrupted, allowing for better planning and consistent quality. To further optimise production, Voortman Steel Machinery has also introduced Digi-Weld, a software solution that fully automates the welding preparation process. This saves time with its analysis and correction of 3D models for welding information at just one click. “The Voortman Fabricator can run 24 hours per day while delivering consistent quality,” said Henk Maassen van den Brink, sales director at Voortman Steel Machinery. “DIGI-WELD makes the Fabricator one of the most accessible welding system in the steel industry.” The Fabricator is easy to integrate into a workshop and does not take up much space, making it a good solution for companies facing a shortage of skilled welders. It is a useful combination of technology and skilled professionals, allowing welders to focus on more challenging welding work while the Fabricator handles repetitive and heavy welding tasks. The introduction of this technology into structural steel production can revolutionise how companies approach projects while ensuring exceptional results every time, the company said. It offers increased reliability compared to manual processes with its ability to complete multiple tasks simultaneously while still maintaining accuracy and precision.
International Tube and Pipe Trade Fair
Düsseldorf, Germany tube.de
Exhibiting at tube Düsseldorf? Visit https://oos.tube.de to find an overview of all advertising options. Final order deadline: January 12th, 2024
International Trade Shows Link Ltd. Exhibition House, 12 Hockley Court
Hockley Heath, Solihull West Midlands, B94 6NW
Voortman Steel Machinery www.voortman.net
Tel 01564 781871 info@itsluk.com
45
www.read-tpt.com
NOVEMBER 2023 tub2402_Tube_Besucheranzeige_2024_mitText_87x260_INT_ICv2_IntrasMag.indd 1 15.09.23 10:35 15.09.23 10:35
Made with FlippingBook Learn more on our blog