TPT May 2009
I ndustry N ews
TMK’s strategic investment programme leads to success
BV, a member of the Royal Dutch/Shell group of companies. The certification testing, including tension and compression tests, was performed on 88.9mm OD TMK FMT premium tubing with a wall thickness of 7.34mm and N80 steel grade.
TMK, Russia, has implemented a long- term strategic investment programme aimed at modernisation of its production facilities and services planned for the period of 2005-2012. Last year TMK installed a 3-roll bending mill, made by Haeusler, with a total capacity of 650,000t of longitudinally welded large diameter pipes per year. The company also took on a premium quality-finishing mill, made by SMS Meer, with a total capacity of 600,000t per year of seamless pipe including OCTG with premium connections. During March this year, TMK shipped 5,000t of 1,420mm longitudinal welded pipes with 26.4mm wall thickness and K60 grade with internal and external anticorrosion coatings to Gazprom. The pipes will be used in the construction of Bovanenkovo-Ukhta gas pipeline. The company’s 3-roll bending mill can produce LSAW with diameters of between 530mm to 1,420mm, wall thickness of up to 42mm and grades of up to X100, which is in line with Gazprom and Transneft standards for new pipelines, including Nord Stream, Eastern Siberia – Pacific Ocean and others. In March, TMK supplied its customers with 19,000t of pipes produced on its PQF mill, including seamless OCTG with premium connections. The PQF mill can be used to make pipes with OD from 73-273mm, wall thickness up to 25mm, and a geometry that twice surpasses API requirements. In addition to the PQF mill, 200,000t of additional heat treatment and threading capacity has been brought online to produce OCTG with premium-threaded connections.
TMK successfully certified ‘TMK FMT’ premium connection at Oil States Industries’ structural test laboratory in Aberdeen, UK. The TMK FMT premium connection was tested for Salym Petroleum Development BV, a joint venture between a subsidiary of Sibir Energy and Shell Salym Development
TMK-Group – Russia Fax : +7 495 775 7601 Email : tmk@tmk-group.com Website : www.tmk-group.com
COMPANIES WHO BELIEVED IN a PaRTneRShIP wITh US:
ROYAL DUTCH SHELL
KELLOGS BROWN AND ROOT, USA
NORSK HYDRO, NORWEGIA
HEEREMAC, THE NETHERLANDS
FMQ, SAUDI ARABIA
WELDING PROCESSES: GTAW GMAW FCAW
QUALITY INTERNATIONAL, UAE
FLUOR DANIEL SADA, USA
CCIC, QATAR
SUEDROHRBAU, SAUDI ARABIA
STORK MEC, BELGIUM
NACAP ASIA PACIFIC, THAILAND
EXXON MOBIL, USA
OILSERV, NIGERIA
GENERAL ELECTRIC, USA
TEKFEN INSAAT, TURKEY
MONTER STROJARSKE MONTAZE, CROATIA
GALFAR E&C, OMAN
• AUTOMATIC PIPE WELDING SYSTEMS AND RELATED EQUIPMENT • FROM 6MM AND UP • INTERNAL/EXTERNAL
ARAMCO SERVICES, SAUDI ARABIA
CANADOIL ASIA, THAILAND
VAM, MCE GROUP, AUSTRIA
OAO LUKOIL, RUSSIA
LARSEN & TOUBRO LTD, INDIA
NIS-NAFTAGAS, SERBIA
The SMS Meer PQF mill in operation at TMK
PETROJET, EGYPT
KEVIEPSZER KFT., HUNGARY
KVV ZRT., HUNGARY
PETROFAC, UAE
ENI-SNAM, SAUDI ARABIA
BIN QURAYA EST, SAUDI ARABIA
andmanymORe...
T +31 321 38 66 77 | F +31 321 31 41 65 | info@magnatech-international.com
www.magnaTech-InTeRnaTIOnaL.cOm
17
www.read-tpt.com
M ay 2009
›
MA09185_MAGNATECH_ADV_118x190.indd 1
29-01-2009 15:30:32
Made with FlippingBook