TPT January 2016
Design Fabr icat ion Instal lat ion Training Proven Performance High Speed Inspection Systems
® ® ® EMI – Amalog , Sonoscope | UT – Truscope , Truscan | Wall Measurement - Truwall ® ®
® Since the first mill installation in 1966, NOV Tuboscope remains the premier provider of Tube, Pipe Mill and End Finisher Inspection Equipment. With over 200 installations worldwide, Tuboscope systems continue to increase production and profitability with reliable performance.
Offering a full turnkey package - custom designed and fabricated to meet rigorous inspection standards:
- High Speed UT and EMI - Centralized Reporting - Product Traceability
www.tuboscope.com NOV Tuboscope – Designed and Engineered for Proven Performance
Email: tuboscopesales @nov.com
© 2012 National Oilwell Varco All rights reserved
D392004521-MKT-002 Rev 02
Made with FlippingBook